Taishan Construction

TAISHAN

TS-2026-TDS-41

3D rendering of the proposed front exterior transformation

Prepared exclusively for this project

Josie

41 Tideswell Boulevard

Driveway & Entrance Transformation

A complete driveway and entrance transformation prepared exclusively for this property. Compare materials, choose your design, and see the investment update as you build your project.

Your Project Total

$15,900.00

5 sections selected · HST excluded

Customize Your Project

The transformation

Before & After

Drag the divider to compare the existing condition of your property with the proposed design.

Driveway — proposed design
Driveway — existing condition
BeforeAfter
<>

Driveway

Existing aging interlock replaced with a new charcoal-bordered driveway and side extension.

Walkway — proposed design
Walkway — existing condition
BeforeAfter
<>

Walkway

Weathered entrance walk rebuilt with fresh interlock and charcoal banding.

See it before you build it

Your Design Renderings

Prepared for Josie before construction begins — every material, border and transition visualized in advance.

Driveway & Entrance

10 views
Front elevation — interlock driveway with charcoal border and side extension
Street approach — driveway, boulevard and walkway
Side extension along the home toward the street
Entrance walkway field with charcoal banding
Front entrance landing at the double doors
Entrance porch with charcoal border banding
Driveway approach — garage facade with address plaque
Garage view with walkway and perimeter lighting
Side extension along the home toward the street
Two-car garage approach with charcoal border

Section 01

Driveway Interlocking

Full driveway interlocking, including the new extension to the side for additional usable parking.

$9,450.00

630 SQFT · $15.00/SQFT

Driveway incl. Side Extension

630 SQFT

Total Proposed Area

630 SQFT

The side extension widens the driveway for easier daily use and parking. The 630 SQFT figure includes the extension.

Section 02

Walkway to Home

Interlocking walkway leading from the driveway to the home's main entrance.

$3,000.00

200 SQFT · $15.00/SQFT

Walkway Area

200 SQFT

Section 03

Landscape Lighting Package

Recommended low-voltage lighting package illuminating the driveway and front walkway for evening arrival, safety and curb appeal.

$2,400.00

16 Each · $150.00/Each

Driveway

5 × 2 sides = 10 lights

Walkway

6 lights

Total

16 lights @ $150 each

Recommended layout: 5 lights along each side of the driveway and 6 along the walkway. Quantities and placement can be adjusted before installation. LED underglow accent lighting for this package is coming soon — we'll share details and pricing as it becomes available.

Section 04

Interlocking Step

New interlocking step, built to match the surrounding paver finish and grade transition.

$600.00

Lump Sum

Interlocking Step

$600.00

Section 05

LED Name & Address Sign

New LED name and address sign installed at the entrance, wired and finished to suit the completed frontage.

$450.00

Lump Sum

LED Name & Address Sign

$450.00

Build your project

Customize Your Project

Include or remove any section and switch between materials. Your total updates instantly.

Driveway Interlocking

$9,450.00

Walkway to Home

$3,000.00

Landscape Lighting Package

$2,400.00

Interlocking Step

$600.00

LED Name & Address Sign

$450.00

Why homeowners choose Taishan

The Taishan Effect

A family-owned GTA company with 20+ years of experience and 1,300+ homes transformed — every project designed before construction begins, and backed in writing after it ends.

See It Before You Build It

3D visualization before construction begins — you approve the design, not a guess.

Built Properly

Proper excavation, grading, drainage, base preparation and installation — preparation beneath the surface.

Warranty-Backed Workmanship

Every project is covered by a 5-year workmanship warranty — confidence after completion, in writing.

Clear Communication

One organized team from concept to completion. Clear scope. Clean execution.

Estimated Build Time

4–5 Days

Once we begin, your project is completed in approximately four to five working days.

One Organized Team

Start to Finish

The same dedicated crew runs your project from the first excavation to the final cleanup.

After Completion

5-Year Warranty

Workmanship warranty backed for five years — confidence long after the last paver is set.

Project Total

$15,900.00

Customize